KG
Plant Downtime Root Cause Hub

Industrial downtime and restart control plane

Downtime incidents, root-cause blockers, and restart-safe escalation in one operator surface.

Root Cause Map

The rule map is where downtime turns into executable restart work.

This lane maps failure-mode requirements to evidence targets, owner lanes, readiness, and blockers that still prevent safe restart routing.

Failure RuleTarget EvidenceOwnerReadiness
Bearing inspection proof
Motor overheat
Mechanical restart safety
Inspection note plus thermal trace and reset historyMaintenance Controlyellow
Valve integrity confirmation
Hydraulic collapse
High-load restart risk
Valve inspection plus pressure-trend confirmation and safety walkthroughReliability Engineeringred
Calibration and QA release
Sensor drift
Release quality confidence
Calibration log and signed QA release noteQuality Engineeringyellow
Safety validation replay
Interlock fault
Protected restart
Interlock replay log and safety validation signoffControls Teamgreen
Dependency Blockers

Where restart recovery is likely to stall.

RC-21 · Maintenance Control

The thermal trace exists, but the bearing inspection note is still missing from the packet.

maintenance · Mechanical restart safety
RC-28 · Reliability Engineering

Valve inspection proof is incomplete across the last maintenance cycle.

safety · High-load restart risk
RC-34 · Quality Engineering

QA release note has not yet been bundled with the calibration log.

quality · Release quality confidence
RC-39 · Controls Team

No blocker; only packet packaging remains.

controls · Protected restart